DCEBData Center Equipment Buyer954-740-1983
Serving La Presa and the surrounding metro

We Buy Data Center Equipment in La Presa, CA

Whether it is one 500 kVA UPS in a La Presa basement or a full hall of cabinets, busway, switchgear and chillers, we will buy it as it sits.

ScopeWe decommission
and load
PaymentBefore the truck
leaves
CoverageAll 50 states
and DC
Data center decommissioning in La Presa, CA
Rooms bought complete in La Presa and across California.
01

Data center equipment buyers in La Presa

Whether it is one 500 kVA UPS in a La Presa basement or a full hall of cabinets, busway, switchgear and chillers, we will buy it as it sits. We quote from an asset list, a maintenance report or a walkthrough, and we come back the same business day with an itemized written offer you can forward straight to finance.

02

What California conditions mean for your number

La Presa sits in California, where PG&E, Southern California Edison, SMUD, LADWP feed the load and I-5, I-80, I-10, US-101 and the 405 carry the freight. That matters to your number: a site close to those corridors is cheaper for us to service, and the savings show up in the offer rather than in our margin. Santa Clara, San Jose, Los Angeles, Sacramento and San Diego are our routine stops, and La Presa work routes with them.

03

What we buy in La Presa

Three-phase, modular and monolithic

UPS Systems

We buy three-phase uninterruptible power supplies out of live and decommissioned white space: modular frames, monolithic units, matching battery cabinets and the static switches that go with them.

10 kVA – 2.5 MVA modules
Floor-mount, RPP and rack PDUs

PDUs

Floor-mount PDUs with integral transformers, remote power panels, and metered or switched rack PDUs by the pallet — we buy all three tiers of distribution.

50 kVA – 1000 kVA floor units
Overhead track, tap boxes, elbows

Busway

Overhead busway is the most reusable thing in a white space and the most commonly thrown away. We buy full runs, tap-off boxes, elbows and end feeds.

225 A – 5000 A runs
LV and MV, ATS, breakers

Switchgear

Low-voltage lineups, medium-voltage metal-clad gear, automatic transfer switches and loose breakers — bought as complete lineups or section by section.

480 V – 38 kV lineups
Diesel and gas, enclosed or open

Generators

Standby diesel and natural gas generator sets, sub-base and belly tanks, paralleling gear and radiator packages — running or not.

100 kW – 3 MW standby sets
Air-cooled, water-cooled, CRAH/CRAC

Chillers

Air-cooled and water-cooled chillers, cooling towers, CRAC and CRAH units, pumps and dry coolers — the whole mechanical plant.

50 – 2000 ton capacity
Compute, storage, network, GPU

Servers

Rackmount compute, storage arrays, network gear and GPU nodes — bought by the rack or by the hall, with documented data destruction.

Single racks – full halls
Everything the equipment sits in

Data Center Infrastructure

Cabinets, containment, cable tray, raised floor, fiber and copper plant — the structure everything else was mounted in.

Cabinets, tray, containment, floor
04

How a project runs

Paperwork travels with the project: certificate of insurance naming your entity, W-9, a signed purchase agreement listing every asset and its price, serialized drive destruction certificates where drives are in scope, and weight tickets or a bill of lading for what leaves the La Presa site. Facilities, security and finance each get the document they need.

05

How the offer is built

What drives the number is condition, generation and demand, in that order. A modular UPS with its power modules intact is worth substantially more than the same frame stripped. A generator with documented low hours and recent load bank results beats an identical unit with no records. Recent-generation servers hold real value; anything past its useful platform life is priced closer to material. We will tell you which bucket your La Presa equipment falls into before you commit to anything.

06

Data security and compliance

Nothing leaves a La Presa site undocumented. Asset tags and serials are recorded as equipment comes out, drives are separated and handled under their own chain of custody, and you receive a reconciled report that your security team can file against the original asset register.

07

What you are actually buying from us

01

We do the decommissioning

Our crews rack out the hardware, de-energize and pull the electrical distribution, recover refrigerant, drain glycol, cut and cap piping, and break down containment and cabinets. You are not hiring a broker who then hires a rigger who then hires a hauler. One company, one point of contact, one insurance certificate.

02

We do the loading

Rigging, lift and crane work, dock plates, pallets, stretch wrap, load bars, straps and the trucks themselves are ours. Overhead busway comes down on lifts. Generators and chillers go out on cranes. Servers leave palletized and manifested. Nothing about the load-out becomes your problem.

03

Payment before the truck leaves

You are paid in full before equipment leaves your dock — wire, company check or cashier's check, your choice. No consignment, no percentage of eventual resale, no invoice you have to chase. The racks stay where they are until the money has landed.

04

Drive destruction, documented

Every data-bearing device is degaussed and physically destroyed, on your floor if you prefer. You receive a certificate of destruction listing serial numbers and a chain-of-custody record signed at each handoff, formatted so your audit team can reconcile it against your asset register.

05

The room is left clean

Floor tiles reset, penetrations patched, abandoned cable removed, debris hauled, and the space swept. Where a landlord or lease requires a specific restoration standard, we work to it and document the result with photographs before and after.

06

Written offers that hold

Quotes are written, itemized by category, and hold for thirty days. If your process needs a formal bid document, a W-9, a certificate of insurance naming your entity, or a purchase order reference on the offer, say so and it is on the paperwork.

08

Electrical equipment we also buy in La Presa

Transformers, switchgear and general electrical apparatus are bought under dedicated programs, on the same terms:

09

Nearby California coverage

We cover the whole California market, so if your equipment is not in La Presa itself, one of these is probably closer:

All California cities

10

Frequently asked questions

Do you buy equipment that is still under a service contract?
Yes, and we will coordinate with the OEM or service provider so contract termination and equipment transfer line up. Tell us at the quote stage which La Presa assets have active coverage; occasionally a transferable contract increases what we can pay.
We are on an upper floor with a small freight elevator. Is that a problem?
It is a routine problem. Large UPS frames, transformers and gensets often have to be disassembled to pass elevator weight limits and door widths. Our survey of your La Presa site establishes the rigging path before we commit to a date, and the cost is already inside the offer.
Do you actually buy data center equipment in La Presa, or just broker it?
We buy it. Data Center Equipment Buyer is the purchaser of record — we fund the purchase, we send our own crews to La Presa to decommission and load, and we take title when the equipment leaves your dock. There is no third-party buyer waiting behind us to approve the price.
What is the smallest job you will take in La Presa?
A single UPS, one generator, a few PDUs or a handful of cabinets is worth a call. Because we route crews across California continuously, small La Presa pickups can usually be added to an existing run rather than priced as a dedicated trip.
How fast can you get to a La Presa site?
Written offers go out the same business day in almost every case. Once an offer is accepted, typical mobilization to La Presa is a few business days for straightforward removals and one to two weeks for large halls that need phased shutdowns, rigging plans or landlord coordination.
Do you handle the decommissioning, or do we have to shut it down first?
We handle it. Our crews rack out IT, de-energize and remove distribution, recover refrigerant under EPA rules, drain and cap glycol loops, break down containment and cabinets, and sweep the space. If the La Presa room is still live we phase the work so load transfers cleanly.

Selling data center equipment in La Presa?

Send the asset list. Written, itemized offer the same business day.

Request a Written Offer

Send the asset list, or just tell us roughly what is in the room. We come back the same business day with a written, itemized offer.

Faster: call or text 954-740-1983
Email an asset list to electricalequipmentbuyers@gmail.com
Mon–Sat, 7am–7pm ET