Pre-mobilizationA decommissioning is a sequencing problem before it is a labor problem. We own the whole sequence — survey, de-energize, de-rack, demolish, recover, rig, haul, document — and we buy the equipment, which is what turns a cost center into a payment.

IT decommissioning comes first: inventory by serial, de-cable, de-rack, separate drives under chain of custody, and palletize. Then the physical layer — cabinets unbolted, containment disassembled, ladder rack and tray removed, structured cabling pulled back, floor tiles and pedestals lifted where the raised floor is coming out.
Electrical demolition follows the outage plan: distribution de-energized and verified, PDUs and RPPs removed, busway sections dropped, switchgear and switchboards disconnected and rigged, UPS frames and battery cabinets removed with batteries properly manifested, transformers de-energized with oil contained, generators disconnected including fuel line isolation and tank handling.
Mechanical work runs in parallel: refrigerant recovered under EPA 608 by certified technicians with documentation, glycol loops drained and disposed, piping cut and capped, CRAC and CRAH units removed, chillers and cooling towers rigged out, pumps and condensers taken with them. Finally the space is swept, penetrations noted, and the room handed back broom clean for the landlord walkthrough.
Rooms that still carry load get phased. The default order is IT and racks first, because they can usually be removed circuit by circuit without touching the plant. Then distribution, once each branch is confirmed dead. Then the power and cooling plant, once the last critical circuit has been transferred or retired.
The phasing is written into the offer, with the outage windows each phase requires. That document is what keeps facilities, security, IT and the landlord aligned, and it is why our projects do not end with somebody improvising in a hall at two in the morning.
General liability, auto, workers' compensation and umbrella, naming your entity as additional insured before crews arrive.
Pre-mobilizationEvery asset itemized with its price and the removal scope stated, plus a W-9 for your vendor file.
At acceptanceSerialized, reconciled against your asset register, method stated per drive.
Per loadEPA 608 recovery documentation, battery manifests, downstream processor records for material recovery.
Per loadCertified scale tickets where weight determines value, and a bill of lading for each departure.
Per loadWhat left, when, on which truck, and where it went, matched line by line to the original list.
At completionWe buy three-phase uninterruptible power supplies out of live and decommissioned white space: modular frames, monolithic units, matching battery cabinets and the static switches that go with them.
10 kVA – 2.5 MVA modulesFloor-mount, RPP and rack PDUsFloor-mount PDUs with integral transformers, remote power panels, and metered or switched rack PDUs by the pallet — we buy all three tiers of distribution.
50 kVA – 1000 kVA floor unitsOverhead track, tap boxes, elbowsOverhead busway is the most reusable thing in a white space and the most commonly thrown away. We buy full runs, tap-off boxes, elbows and end feeds.
225 A – 5000 A runsLV and MV, ATS, breakersLow-voltage lineups, medium-voltage metal-clad gear, automatic transfer switches and loose breakers — bought as complete lineups or section by section.
480 V – 38 kV lineupsDiesel and gas, enclosed or openStandby diesel and natural gas generator sets, sub-base and belly tanks, paralleling gear and radiator packages — running or not.
100 kW – 3 MW standby setsAir-cooled, water-cooled, CRAH/CRACAir-cooled and water-cooled chillers, cooling towers, CRAC and CRAH units, pumps and dry coolers — the whole mechanical plant.
50 – 2000 ton capacityCompute, storage, network, GPURackmount compute, storage arrays, network gear and GPU nodes — bought by the rack or by the hall, with documented data destruction.
Single racks – full hallsEverything the equipment sits inCabinets, containment, cable tray, raised floor, fiber and copper plant — the structure everything else was mounted in.
Cabinets, tray, containment, floorIT asset disposition with serialized reporting, data destruction and documented downstream recovery.
ServiceNIST 800-88 wiping, degaussing and on-site physical shredding with certificates.
ServiceRigging, disassembly, elevator and dock logistics, freight and site sweep.
Same business day, itemized, with the removal scope stated.
Send the asset list, or just tell us roughly what is in the room. We come back the same business day with a written, itemized offer.