DCEBData Center Equipment Buyer954-740-1983
Process · Six steps

How It Works

No mystery and no discovery phase that quietly becomes a billable project. Six steps from the first email to the closeout report, with the money changing hands before the equipment does.

ScopeWe decommission
and load
PaymentBefore the truck
leaves
CoverageAll 50 states
and DC
Site survey of data center power and cooling equipment
The survey settles the rigging path before anyone commits to a date.
01

The six steps

Step 01

Asset list or photos

Make, model, quantity, and capacity where it applies. Nameplate photos beat descriptions. No list? We build one on a walk.

You send
Step 02

Written itemized offer

Same business day, line by line, removal scope stated, ready to forward to finance.

We send
Step 03

Access survey

Dock, elevator, doors, floor loading, escorts, outage windows. Rigging path fixed before scheduling.

Together
Step 04

Decommissioning

De-energize, de-rack, demolish, recover refrigerant, break down containment, sweep. Phased where load stays up.

Our crews
Step 05

Payment

Wire, check or cashier's check before the trailer leaves. Per load on phased projects.

On the dock
Step 06

Closeout

Signed agreement, destruction certificates, refrigerant records, weight tickets, reconciled final report.

Audit-ready
02

What we need from you

Very little, and none of it is difficult. An asset list or photographs. A point of contact who can get us into the building. The outage window if load is still live. Any landlord, security or compliance requirements we should design around. And a target date, even an approximate one, because most schedules are driven by a lease or a project milestone.

03

What we bring

Insured, background-checked crews. Rigging and lift equipment. Refrigerant recovery certification. Drive destruction capability, including mobile shredding. Packaging and floor protection. Trucking. And the paperwork — certificate of insurance, W-9, signed purchase agreement, manifests and certificates — without being chased for it.

04

Start here

Three-phase, modular and monolithic

UPS Systems

We buy three-phase uninterruptible power supplies out of live and decommissioned white space: modular frames, monolithic units, matching battery cabinets and the static switches that go with them.

10 kVA – 2.5 MVA modules
Floor-mount, RPP and rack PDUs

PDUs

Floor-mount PDUs with integral transformers, remote power panels, and metered or switched rack PDUs by the pallet — we buy all three tiers of distribution.

50 kVA – 1000 kVA floor units
Overhead track, tap boxes, elbows

Busway

Overhead busway is the most reusable thing in a white space and the most commonly thrown away. We buy full runs, tap-off boxes, elbows and end feeds.

225 A – 5000 A runs
LV and MV, ATS, breakers

Switchgear

Low-voltage lineups, medium-voltage metal-clad gear, automatic transfer switches and loose breakers — bought as complete lineups or section by section.

480 V – 38 kV lineups
Diesel and gas, enclosed or open

Generators

Standby diesel and natural gas generator sets, sub-base and belly tanks, paralleling gear and radiator packages — running or not.

100 kW – 3 MW standby sets
Air-cooled, water-cooled, CRAH/CRAC

Chillers

Air-cooled and water-cooled chillers, cooling towers, CRAC and CRAH units, pumps and dry coolers — the whole mechanical plant.

50 – 2000 ton capacity
Compute, storage, network, GPU

Servers

Rackmount compute, storage arrays, network gear and GPU nodes — bought by the rack or by the hall, with documented data destruction.

Single racks – full halls
Everything the equipment sits in

Data Center Infrastructure

Cabinets, containment, cable tray, raised floor, fiber and copper plant — the structure everything else was mounted in.

Cabinets, tray, containment, floor
05

Frequently asked questions

How fast is the offer?
Same business day in nearly every case once we have a list or photos. Complex multi-hall projects sometimes need a walk first, scheduled within a few days.
Do we sign anything before the survey?
No. Quotes and surveys are free and carry no obligation. A signed purchase agreement comes only when you accept an offer.
Can you work around our change-control process?
Yes, and we would rather see it early. Method statements, risk assessments and change tickets are normal in enterprise and healthcare environments and we produce them as part of the scope.
What if the room does not match the list?
We show you exactly which lines changed and why, with photographs, and reissue the offer. We do not renegotiate the total without identifying the specific assets that differed.
Who is our point of contact?
One person from quote through closeout, reachable at 954-740-1983 rather than through a ticket queue.

Send the list. Get a written number.

Same business day, itemized, with the removal scope stated.

Request a Written Offer

Send the asset list, or just tell us roughly what is in the room. We come back the same business day with a written, itemized offer.

Faster: call or text 954-740-1983
Email an asset list to electricalequipmentbuyers@gmail.com
Mon–Sat, 7am–7pm ET